ONE DECK, 250,000 PAIRS OF FEET – NO PROBLEM!
In the summer of 2022, a very special project took shape in the moat at the Tower of London. Superbloom – a huge wildflower meadow with snaking boardwalks and viewing platforms – was designed to be a celebration of the Her Majesty Elizabeth II’s Platinum Jubilee, and a symbol of rebirth following two years of pandemic.
Designed and built by landscape designer Karl Harrison, the project featured an astonishing 69 square metres of pine decking and 57 linear metres of boardwalk, interplanted with more than 20 million wildflower seeds.
From June until the end of September, a quarter of a million people trod the boardwalks at Superbloom – and with the installation set to remain at the Tower for a further 5 years, it was essential that the structures are built to last.
Fit for Royalty
That’s why the team at Harrison Landscapes used fixings by UK company, Carpenter’s Mate – almost 4,000 of them! Karl and his team spent six weeks at the end of 2021 developing the structural specifications and overall design of the decking and boardwalks.
As he explains, he only had one brand in mind when it comes to the construction: “I discovered Carpenters Mate when I needed some exceptional quality stainless decking screws, and was given a sample from my local merchant. I contacted the guys at OSC directly and haven’t looked back since. I knew straight away we would use Carpenters Mate fixings [for Superbloom] because this Royal project demanded the best and I wouldn’t allow Her Majesty to have anything less.”
Built to last
Work began on site in February 2022 and was completed in an impressive two weeks. The decking was designed to comply with Euro Code 5 and featured a Use Class 4 of timber with grooves and pairs of anti-slip strips in the surface, equipping it for heavy foot traffic and a long service life.
“For this project, I used their 6.5mm x 150mm structural fixings because they offer a 25-year warranty and are by far the best on the market for the money. The decking had a mighty thickness, and I wanted the very best screws to hold it in place, so here I opted for the 100mm stainless bugle head screws, Karl explained.
Frazer Dunn from Carpenter’s Mate commented: “We were absolutely delighted and honoured to learn that Karl had selected Carpenter’s Mate fixings for this prestigious project. Our fixings are designed for supreme ease of application and carry a lifetime guarantee, which makes them a smart choice for landscaping work – especially on projects that need to withstand heavy wear and tear due to foot traffic or the elements.”
To find out more about Carpenter’s Mate, or to locate your nearest stockist, visit carpentersmate.oscsales.co.uk
